Afghanistan Mezar-ı Şerif Strategic Air Lift Project
Wet Pipe Sprinkler System, Plumbing, Hvac, Utility,Fire Pum And Fire Water Storage Tanks System, Power Generator Fuel System, Lighting, Small Power, Earthing And Lightning, Fire Alarm , Data System, Outsite Power Distribution, Genset
-
Project Value : 2.175.000 USD
-
Project Contractor : Yüksel İnşaat A.Ş.
-
Project Date : 01.06.2012